BFT P125002

Mwongozo wa Maelekezo ya Kifaa cha Kuhifadhi Betri cha BFT SB-BAT P125002 24V DC

For BFT Gate Opener Systems

1. Utangulizi

This manual provides essential instructions for the installation, operation, and maintenance of the BFT SB-BAT P125002 24V DC Battery Backup Kit. This kit is designed to ensure continuous operation of compatible BFT gate openers during temporary power outages. Please read this manual thoroughly before proceeding with installation or use.

2. Bidhaa Imeishaview

The BFT SB-BAT P125002 is a 24V DC battery backup system that integrates with specific BFT gate operators. It includes a smart charger board that manages battery charging when main power is available and automatically switches to battery power when the main supply is interrupted.

BFT SB-BAT P125002 Battery Backup Kit components in box

Kielelezo 1: Zaidiview of the BFT SB-BAT P125002 Battery Backup Kit, showing the product box, two batteries, wiring, and mounting hardware.

2.1. Vipengele vya Kit

Individual components of the BFT SB-BAT P125002 Battery Backup Kit

Kielelezo 2: Kina view of the BFT SB-BAT P125002 kit components, including batteries, wiring, mounting brackets, and the battery holder.

3. Utangamano

This battery backup system is compatible with the following BFT gate operator series:

Ensure your gate operator model is listed above for proper functionality.

4. Kuweka na Kuweka

Installation of the BFT SB-BAT P125002 kit is designed to be straightforward. However, it is recommended that installation be performed by a qualified technician to ensure safety and correct operation. Always disconnect main power to the gate operator before beginning installation.

4.1. Tahadhari za Usalama

4.2. Hatua za Usakinishaji (Miongozo ya Jumla)

  1. Mount the Battery Holder: Secure the battery holder/mounting base within the gate operator's control box or an appropriate enclosure using the provided mounting brackets and fasteners. Ensure it is stable and accessible.
  2. Weka Betri: Place the two 12V 1.2Ah batteries into the battery holder.
  3. Unganisha Betri: Connect the batteries in series to achieve 24V DC, following the wiring diagram provided with your specific gate operator or the kit's smart charger board. Ensure correct polarity.
  4. Connect Smart Charger Board: Integrate the smart charger board into the gate operator's control unit. Refer to your gate operator's manual for the specific connection points for the battery backup system.
  5. Wiring Salama: Route and secure all wiring to prevent pinching or damage.
  6. Rejesha Nguvu: Once all connections are verified and secure, restore main power to the gate operator. The smart charger board will begin charging the batteries.
  7. Mfumo wa Mtihani: Perform a power outage simulation to verify the battery backup system activates correctly and powers the gate operator.

5. Maagizo ya Uendeshaji

The BFT SB-BAT P125002 operates automatically once installed correctly.

5.1. Normal Operation (Power On)

When main power is supplied to the gate operator, the smart charger board within the SB-BAT kit continuously monitors the battery charge level. It will charge the batteries as needed to maintain them at full capacity.

5.2. Nguvu Outage Operation (Power Off)

Katika tukio la nguvu outage, the smart charger board automatically detects the loss of main power and switches the gate operator to battery power. The gate operator will then function normally using the stored energy in the batteries. The duration of operation on battery power depends on the frequency of gate usage and the charge level of the batteries.

6. Matengenezo

Matengenezo ya mara kwa mara huhakikisha uimara na uaminifu wa mfumo wako wa chelezo cha betri.

6.1. Kuchaji Betri

Baada ya nguvu outage, once main power is restored, the smart charger board will automatically begin recharging the batteries. A full recharge typically takes Saa 12 hadi 14. It is important to allow sufficient time for batteries to fully recharge after use.

6.2. Fuse Check

Mfumo ni pamoja na a 20A fuse for protection. If the battery backup system fails to operate or charge, inspect the fuse for continuity. Replace with a fuse of the exact same rating if necessary. Always disconnect power before checking or replacing fuses.

6.3. Muda wa Matumizi ya Betri na Ubadilishaji

Batteries have a finite lifespan. Periodically test the system by simulating a power outage to ensure batteries hold a charge and can power the gate operator. If performance degrades significantly, consider replacing the batteries. Use only recommended replacement batteries (2x 12V 1.2Ah sealed lead-acid).

7. Utatuzi wa shida

If your BFT SB-BAT P125002 battery backup system is not functioning as expected, consider the following:

For persistent issues, contact BFT technical support or a qualified service technician.

8. Vipimo

KipengeleVipimo
Nambari ya MfanoP125002
Aina ya BetriAsidi ya risasi iliyofungwa
Uwezo wa Betri2x (12V 1.2Ah)
Pato Voltage24V DC (ya kawaida)
Malipo Voltage27.2V
Malipo ya Sasa130mA
Muda wa Kuchaji BetriSaa 12-14
Exhausted Battery Protection Threshold20.4V
Ukadiriaji wa Fuse20A
Joto la UendeshajiData detected with external temperature of: 25°C (77°F)

9. Udhamini na Msaada

For warranty information, please refer to the documentation provided with your original purchase or contact BFT customer support directly. For technical assistance, installation queries, or troubleshooting beyond the scope of this manual, please contact your authorized BFT dealer or BFT technical support.

BFT Contact Information: Please visit the official BFT webtovuti kwa maelezo ya sasa ya mawasiliano na nyenzo za usaidizi.

Nyaraka Zinazohusiana - P125002

Kablaview Mfumo wa Kiotomatiki wa Lango la Kielektroniki la BFT DEIMOS BT UL/CSA
Gundua BFT DEIMOS BT UL/CSA, mfumo wa kiotomatiki wa kielektroniki kwa malango ya kuteleza ya raki. Ikiwa na teknolojia mahiri, uendeshaji salama wa 24V, na usakinishaji rahisi, mfumo huu huongeza usalama na urahisi wa lango. Chunguza vipimo vyake vya kiufundi na vifaa vinavyopatikana kwa matumizi ya makazi na biashara.
Kablaview BFT Mitto 2M/4M Maagizo ya Usimbaji wa Mbali: Mwongozo wa Kina
Jifunze jinsi ya kupanga vidhibiti vyako vya mbali vya BFT Mitto 2M na 4M kwa gereji na vifungua milango. Mwongozo huu unashughulikia usimbaji kwa wapokeaji walio na na bila skrini za dijitali, ikijumuisha maonyo muhimu ya usalama.
Kablaview Mwongozo wa Ufungaji wa Ufungaji wa Lango la Swing la BFT VIRGO
Usakinishaji wa kina na mwongozo wa mtumiaji wa mfumo wa otomatiki wa lango la swing la BFT VIRGO, unaofunika usalama, vipimo vya kiufundi, taratibu za usakinishaji, upangaji programu na matengenezo.
Kablaview Mwongozo wa Usakinishaji na Uso BFT GIOTTO 30-60 S BT / GIOTTO 30-60 BT
Mwongozo wa kukamilisha usakinishaji na utumiaji wa kizuizi kiotomatikihe BFT GIOTTO 30-60 S BT na GIOTTO 30-60 BT. Jumuisha mbinu maalum, usanidi na manutenzione.
Kablaview Maagizo ya Kuandika Msimbo wa Mbali wa BFT MITTO 2B | Remotes za Zamani
Mwongozo wa hatua kwa hatua wa kuweka msimbo wa mbali wa BFT MITTO 2B kwa vifungua lango, unaohusu mbinu zilizopo za skrini ya LCD ya mbali na ya kipokezi. Unajumuisha vidokezo vya utatuzi wa matatizo.
Kablaview Mwongozo wa Usakinishaji wa Mfumo wa Udhibiti wa Redio wa BFT CLONIX1-2 & MITTO 2-4 433MHz
Mwongozo kamili wa usakinishaji wa kipokezi cha BFT CLONIX1-2 na vipitishi vya kudhibiti redio vya MITTO 2-4 433MHz, unaoshughulikia programu, uundaji wa kloni, usalama, na vipimo vya kiufundi kwa ajili ya otomatiki ya lango na mlango.